House / Basement
September 14
These photos were taken during our pre-drywall walkthrough.
August 30
Much of the HVAC, plumbing and electrical roughin is complete.
July 27
The basement floor has been poured.
July 24
The vapor barrier is in place (sort of), the steel is set, and the basement is ready for the flat work pour.
July 19
The forms are off the basement walls.
|