Work on garage entry deck continues. Today I fabricated the 8 newel posts from 4×4 cedar, installed bead board on the skirt, installed 4 of the newel posts, and attached the trim at the top and bottom of the beadboard.
Work on garage entry deck continues. Today I fabricated the 8 newel posts from 4×4 cedar, installed bead board on the skirt, installed 4 of the newel posts, and attached the trim at the top and bottom of the beadboard.